Initial Technical Development of BM
Raffael Fonti
Detalhes do Projeto
Estatísticas
Descrição do Projeto
Project: BM
Reference: BM-ET-001, Revision 01
Duration: 90 calendar days from the official commencement date
Work Arrangement: Remote, with multidisciplinary coordination
Project Objective
The purpose of this initial 90-day assignment is to establish the technical foundations of BM, a large-scale commercial development involving multiple architectural, engineering, and design disciplines.
The assignment covers feasibility studies, preliminary architectural design, engineering concepts, infrastructure planning, landscape architecture, interior design, BIM coordination, and preliminary cost estimation.
By the end of the 90-day period, the multidisciplinary team is expected to deliver a coordinated preliminary design package, supported by engineering studies, technical documentation, and cost estimates to guide subsequent development phases.
Scope of Work by Discipline
1. Architecture and Urban Planning
Develop preliminary architectural studies and schematic designs.
Prepare the masterplan, site layout, and functional zoning.
Define commercial units, common areas, circulation, and accessibility.
Produce preliminary floor plans, sections, elevations, and area schedules.
Coordinate architectural concepts with engineering disciplines.
2. Structural Engineering
Evaluate structural system alternatives.
Develop preliminary structural concepts and sizing.
Identify foundation requirements based on geotechnical investigations.
Coordinate structural solutions with the architectural design.
3. Civil Engineering: Infrastructure and Drainage
Develop preliminary earthwork and grading studies.
Evaluate site access, parking areas, and pavement systems.
Prepare preliminary stormwater drainage and retention concepts.
Identify infrastructure constraints and technical requirements.
4. Plumbing and Sanitary Engineering
Develop preliminary water supply and wastewater system concepts.
Assess water storage, individual metering, and rainwater reuse.
Conduct preliminary utility feasibility consultations.
Coordinate utility requirements with architectural layouts.
5. Electrical Engineering
Estimate electrical demand for commercial units and common areas.
Develop preliminary power distribution and lighting concepts.
Evaluate electrical substations, photovoltaic generation, and future expansion.
Conduct preliminary utility consultations.
6. Mechanical Engineering: HVAC, Gas, and Ventilation
Develop preliminary HVAC and ventilation concepts.
Identify kitchen exhaust and gas distribution requirements.
Define preliminary technical spaces, equipment locations, and service shafts.
Coordinate mechanical systems with architectural and structural concepts.
7. Fire Protection, Safety, and Accessibility
Conduct preliminary occupancy and fire-risk assessments.
Evaluate emergency exits, evacuation routes, and fire protection requirements.
Review accessibility provisions and circulation routes.
Identify applicable fire safety and accessibility requirements.
8. Landscape Architecture
Assess environmental constraints and existing vegetation.
Develop preliminary landscape concepts for outdoor areas.
Propose planting, outdoor furniture, and pedestrian-area guidelines.
Coordinate landscape elements with drainage and architectural planning.
9. Interior Design
Develop interior design concepts for shared commercial facilities.
Establish preliminary material palettes, finishes, furniture, and lighting concepts.
Prepare functional guidelines for common areas.
Develop preliminary interior design guidelines for future tenants.
10. Technical Drafting and BIM Modeling
Organize technical drawings and discipline-specific models.
Support the development of preliminary plans and technical documentation.
Establish consistent modeling and drawing standards.
Update BIM models based on coordination reviews.
11. Technical Coordination and BIM Management
Prepare the BIM Execution Plan.
Establish the project schedule and responsibility matrix.
Coordinate communication between technical disciplines.
Conduct interdisciplinary coordination reviews.
Identify, document, and monitor design clashes and technical conflicts.
12. Cost Estimation and Project Planning
Prepare preliminary parametric cost estimates.
Develop the master schedule for subsequent project phases.
Identify budget risks, scheduling constraints, and technical dependencies.
Support the evaluation of alternative technical solutions.
90-Day Project Schedule
Milestone
Deadline
Required Deliverables
M1
Day 15
Team mobilization, approved BIM Execution Plan, and detailed project schedule
M2
Day 42
Topographic surveys, site records, geotechnical investigations, environmental assessment, and feasibility study
M3
Day 63
Approved preliminary architectural study and coordinated engineering concepts
M4
Day 90
Architectural preliminary design, interior design concept, clash detection report, preliminary cost estimate, and master schedule
Final Deliverables
At the conclusion of the 90-day assignment, each professional shall submit the technical documentation relevant to their assigned discipline, including applicable drawings, studies, BIM models, reports, calculations, and preliminary specifications.
All deliverables must be properly identified, version-controlled, and submitted in accordance with the project's technical documentation standards.
The final package must clearly identify completed activities, outstanding technical issues, design assumptions, dependencies, and recommendations for the next development phase.
Coordination and Quality Requirements
All professionals must coordinate their work with the relevant disciplines and follow the technical requirements established in document BM-ET-001.
Regular coordination meetings and technical reviews will be conducted throughout the assignment.
Deliverables will be reviewed against the agreed scope, technical standards, and acceptance criteria.
The initial assignment does not include complete construction documentation, final regulatory approvals, or construction supervision unless separately contracted.
Project Duration: 90 calendar days
Assignment Type: Initial Technical Development
Project Reference: BM-ET-001, Revision 01
Client: Jacob Architecture Group LLC